Lewisham
Demolition and excavation of existing rear lightwell at basement level to form a new lightwell and steps over existing, overall lightwell footprint, demolition of concrete terrace and steps on the north side of the house and replacement with an extended terrace/ balcony and railings, relocation of brick pavers in the front garden and construction of a bin store at 36 Dartmouth Row, SE10.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- DC/24/138075
- Local authority
- Lewisham
- Ward
- Blackheath
- Application type
- Householder
- Property type
- House
Key dates
- Submitted
- 19 Nov 2024
- Validated
- 19 Nov 2024
- Target decision
- 27 Feb 2025
- Decided
- 27 Feb 2025
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.