Lewisham
Details of Condition (14) - Tree Protection During Construction submitted in connection with planning permission DC/19/113542 dated 20 November 2019 for construction of a two-storey school building and single storey ancillary buildings to provide a satellite site for the expansion of Greenvale Special Educational Needs Secondary School, being D1 (educational) floorspace including a staff terrace, with roof-level plant and photo-voltaic panels, together with associated provision of a sub-station, sprinkler plant enclosure, pedestrian and vehicle access arrangements with canopy cover, vehicle parking, cycle parking, external play space, hard and soft landscaping, and associated ancillary works at the former Brent Knoll School, Mayow Road, SE23.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- DC/20/117286
- Local authority
- Lewisham
- Ward
- Perry Vale
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 29 Jun 2020
- Validated
- 29 Jun 2020
- Decided
- 28 Jan 2021
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- BRENT KNOLL SCHOOL LewishamPermittedNext door
- LewishamPermittedNext door
- LewishamPermittedNext door
- LewishamPermittedNext door
- Brent Knoll School LewishamPermittedNext door
- LewishamWithdrawnAdjoining