Brockwell Park, junction of Dulwich Road Norwood Road Lambeth SE24
Improvement works to the Herne Hill junction. The works involve the change of use of part of Brockwell Park to form a slip lane carriageway, for vehicles turning left from Norwood Road into Dulwich Road, various junction modifications, removal and re-alignment of part of the Park boundary with repositioned railings and main entrance gates, provision of hard and soft landscaping including new tree and shrubbery planting, provision of improved street lighting at entrance to park and formation of new pedestrian islands, safety barrier and crossing facilities.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 07/03341/RG3
- Local authority
- Lambeth
- Postcode
- SE24
- Ward
- HERNE HILL
- Application type
- All Other
Key dates
- Decided
- 23 Apr 2008
Estimated project value
£21k–£135k
Typical UK cost for this job type, at inner London rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Dulwich Road Lambeth SE24 0PAPendingAdjoining
- 15 Norwood Road London Borough of Southwark SE24 9AAPermittedAdjoining
- 15 Norwood Road London Borough of Southwark SE24 9AAPermittedAdjoining
- Norwood Road London Borough of LambethPermittedAdjoining
- Dulwich Road London Borough of Lambeth SE24 0PAPermitted49 yd
- London Borough of SouthwarkPermitted53 yd