Kensington & Chelsea
Replacement of white timber single glazed sliding sash windows to front elevation with exact double glazed timber replicas of the original. Replacement of white timber single glazed sliding sash windows to rear/LHS elevation with exact double glazed uPVC replicas of the original. Replacement of rear white timber single glazed door with replica double glazed uPVC door set. Fascia/soffit boards to be redecorated to match existing.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PP/21/04289
- Local authority
- Kensington
- Ward
- St Helen's
- Application type
- Householder
Key dates
- Submitted
- 13 Jul 2021
- Validated
- 13 Jul 2021
- Comments close
- 13 Aug 2021
- Decided
- 26 Aug 2021
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Kensington & ChelseaPermittedNext door
- Kensington & ChelseaWithdrawnNext door
- Kensington & ChelseaPermittedNext door
- Kensington & ChelseaPermittedNext door
- Kensington & ChelseaPermittedAdjoining
- Kensington & ChelseaPermittedAdjoining