Kensington & Chelsea
Replacement of existing white timber single glazed sash and casement windows to front, side and rear elevation with proposed white UPVC double glazed sash and casement units. Existing fascia's and soffit's are to replaced in UPVC, colour to match existing. Existing rear timber single glazed door set to be replaced with UPVC double glazed unit to match existing colour - white.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- PP/21/02126
- Local authority
- Kensington
- Ward
- St Helen's
- Application type
- All Other
Key dates
- Submitted
- 19 Apr 2021
- Validated
- 19 Apr 2021
- Comments close
- 21 May 2021
- Decided
- 14 Jun 2021
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Kensington & ChelseaPermittedAdjoining
- Kensington & ChelseaPermittedAdjoining
- Kensington & ChelseaPermittedAdjoining
- Kensington & ChelseaWithdrawnAdjoining
- Kensington & ChelseaPermitted49 yd
- Kensington & ChelseaPending49 yd