← Back to search

PermittedP2025/3008/MINSubmitted 10 months agoWindows and doors

Bakers Field Islington

1) Replacement of all white uPVC external windows, associated doors and insulated spandrel panels with white uPVC replacement window assemblies achieving a minimum classification of A2, s1-do (limited combustibility) or better in accordance with BS EN 13501-1 with cavity barriers installed around the window openings. The thermal performance of the window assemblies will also be enhanced. 2) Encapsulating the existing exposed wood wool boarded soffits with a new external soffit board (colour to be confirmed) that achieves a minimum classification of A2- s1-do (limited combustibility) or better. 3) Replacement of the existing black painted timber T & G cladding system with a new black rainscreen cladding system achieving a rating of A1 or A2-s1-d0(limited combustibility) fixed to a noncombustible support/bracketry system complete with new cavity and fire barriers. 4) Any necessary repairs to the existing facing brickwork will be carried out with a facing brick that closely matches the existing.As a result of a serious fire to a flat in November2024, our client is also proposing to carry out internal passive fire remediation works to all flats across the Bakersfield Estate. Written advice with site visit £1,378.42 £275.68 £1,654.10

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
21 Nov 2025
— completed
Validated
21 Nov 2025
— completed
Consultation
— completed
Target date
15 Jan 2026
— completed
Decided
2 Feb 2026
— completed

Application details

Reference
P2025/3008/MIN
Local authority
Islington
Application type
All Other
Property type
Flat

Key dates

Submitted
21 Nov 2025
Validated
21 Nov 2025
Target decision
15 Jan 2026
Decided
2 Feb 2026

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications