← Back to search

PermittedP2020/2603/LBCSubmitted 5 years agoBasement

35 Duncan Terrace Islington

Repair, restoration and alterations works to property comprising of external works to include: removal of existing tiles and replacement with stone pavers to entrance steps; refurbishment of windows; replacement roofing material; roof terrace and associated access; PV panels; installation of walk-on rooflight, and balustrading to form roof terrace; installation of rear gantry and steps at ground floor level; basement lowering works, garden works and erection of a garden room at rear. Internal works to include: reconfiguration and reinstatement of plan form; removal of existing kitchen and bathroom sets; reinstatement of fireplaces; replacement doors; refurbishment of existing staircases with installation of new staircase to roof level; and associated works.

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
23 Sept 2020
— completed
Validated
23 Sept 2020
— completed
Consultation
8 Nov 2020
— completed
Target date
18 Nov 2020
— completed
Decided
18 Dec 2020
— completed

Application details

Reference
P2020/2603/LBC
Local authority
Islington
Ward
St. Peters - historic
Application type
All Other
Property type
House

Key dates

Submitted
23 Sept 2020
Validated
23 Sept 2020
Comments close
8 Nov 2020
Target decision
18 Nov 2020
Decided
18 Dec 2020

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications