Telecommunications Mast 141621 Sewage Works Kings Barn Lane Steyning West Sussex
Upgrade existing telecommunications base station comprising the removal of the existing lattice mast, with height to top of antennas 17.5 metres (height to underside of existing omni antenna 19.5 metres) and the siting of a replacement monopole mast, with height to top of headframe and antennas of 20.0 metres (height to underside of omni antenna of 22.0 metres), associated removal of 6 no. antennas and installation of 9 no. replacement antennas, the relocation of the existing omni antenna and relocation of the existing 300mm diameter dish antenna, the removal and replacement of 1 no. GPS module and ancillary works (upgraded radio equipment to be housed within the existing equipment cabin).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- DC/26/1617
- Local authority
- Horsham
- Property type
- Agricultural
Key dates
- Submitted
- 7 Oct 2026
- Validated
- 7 Oct 2026
- Target decision
- 4 Nov 2026
Estimated project value
£20k–£80k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.