London Borough of Hammersmith and Fulham
Demolition of existing buildings and structures, and comprehensive phased redevelopment of existing school site comprising erection of two new buildings ranging from 2 to 8 storeys containing 307no. residential units (Use Class C3), and one school building ranging from 2 to 5 storeys to provide 8,091 sqm (GIA) of educational floorspace (Use Class F1) including alteration of existing buildings, together with private and communal amenity space, landscaping, car parking, cycle parking and other associated works.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2025/02541/FUL
- Local authority
- Hammersmith and Fulham
- Ward
- WORMH
- Application type
- All Other
Key dates
- Submitted
- 16 Dec 2025
- Validated
- 16 Dec 2025
- Comments close
- 16 Feb 2026
- Target decision
- 7 Apr 2026
Estimated project value
£15k–£120k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Floor area gained: 36,922m²
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- The Curve London Borough of Hammersmith and Fulham W12 0RQUnknownNext door
- The Curve London Borough of Hammersmith and Fulham W12 0RQPendingNext door
- The Curve London Borough of Hammersmith and Fulham W12 0RQPendingAdjoining
- The Curve London Borough of Hammersmith and Fulham W12 0RQPendingAdjoining
- Phoenix High School The Curve Hammersmith and Fulham W12 0RQPermitted76 yd
- Phoenix High School The Curve Hammersmith and Fulham W12 0RQPermitted103 yd