London Borough of Hammersmith and Fulham
Submission of details of Zero Emission Air Source Heat Pumps or Electric Boilers to be provided for space heating and hot water for each dwellinghouse pursuant to condition 24 of planning permission ref: 2021/01990/VAR granted 8th March 2022.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2023/02073/DET
- Local authority
- Hammersmith and Fulham
- Ward
- WALGR
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 9 Aug 2023
- Validated
- 9 Aug 2023
- Comments close
- 1 Sept 2023
- Target decision
- 4 Oct 2023
- Decided
- 21 Dec 2023
Estimated project value
£8k–£15k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamWithdrawnNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door