London Borough of Hammersmith and Fulham
Submission of details of the installation of the Zero Emission MCS certified Air/Water Source Heat Pumps or Electric Boilers to be provided for space heating and hot water, pursuant to Condition 15 of planning permission reference: 2021/02298/FUL dated 9th February 2022.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2022/03164/DET
- Local authority
- Hammersmith and Fulham
- Ward
- HAMBRO
- Application type
- All Other
Key dates
- Submitted
- 31 Oct 2022
- Validated
- 31 Oct 2022
- Comments close
- 22 Nov 2022
- Target decision
- 26 Dec 2022
- Decided
- 12 Dec 2022
Estimated project value
£8k–£15k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / GreenMatch 2026, excluding Boiler Upgrade Scheme grant.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermitted49 yd