London Borough of Hammersmith and Fulham
Replacement of all existing single glazed timber framed windows with new double glazed timber framed windows to the front elevation, replacement of all existing single glazed timber framed windows with new double glazed uPVC windows to the side and rear elevation.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2022/02809/FUL
- Local authority
- Hammersmith and Fulham
- Ward
- FULTOW
- Application type
- All Other
Key dates
- Submitted
- 7 Oct 2022
- Validated
- 7 Oct 2022
- Comments close
- 28 Oct 2022
- Target decision
- 2 Dec 2022
- Decided
- 28 Nov 2022
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- Burlington Road Hammersmith And Fulham SW6 4NHPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- 194 New King's Road London Borough of Hammersmith and Fulham SW6 4NFPendingNext door
- 202 New Kings Road Hammersmith and Fulham SW6 4NFPermittedNext door
- 204 New Kings Road Hammersmith and Fulham SW6 4NFPermittedAdjoining