London Borough of Hammersmith and Fulham
Installation of an upgrade and replacement to existing rooftop telecommunications equipment, including the removal and replacement of 6no. antennas (including relocation of 2no. antennas), 1no. satellite dish, 1no. GPS, 12no. RRU's, replacement of hooped ladder and new handrail, upgrade within the existing equipment cabin and associated ancillary works.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2022/02339/FUL
- Local authority
- Hammersmith and Fulham
- Ward
- GROVE
- Application type
- All Other
Key dates
- Submitted
- 17 Aug 2022
- Validated
- 17 Aug 2022
- Comments close
- 9 Sept 2022
- Target decision
- 12 Oct 2022
- Decided
- 20 Jun 2023
Estimated project value
£20k–£80k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 100 Cambridge Grove London Borough of Hammersmith and FulhamRefusedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- 100 Cambridge Grove Hammersmith and Fulham W6 0LEPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- 100 Cambridge Grove London Borough of Hammersmith and FulhamRefusedNext door
- 100 Cambridge Grove London Borough of Hammersmith and FulhamPendingNext door