London Borough of Hammersmith and Fulham
Replacement of all existing single glazed timber casement windows with new double glazed uPVC casement windows; replacement of all existing single glazed timber French doors with new double glazed uPVC French doors to the rear elevation at ground floor level.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2022/00699/FUL
- Local authority
- Hammersmith and Fulham
- Ward
- MUNSTE
- Application type
- All Other
Key dates
- Submitted
- 17 Mar 2022
- Validated
- 17 Mar 2022
- Comments close
- 7 Apr 2022
- Target decision
- 12 May 2022
- Decided
- 11 May 2022
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 55 Colehill Lane London Borough of Hammersmith and Fulham SW6 5EFPermittedNext door
- 49 Colehill Lane London Borough of Hammersmith and Fulham SW6 5EFPermittedNext door
- 47 Colehill Lane London Borough of Hammersmith and Fulham SW6 5EFPermittedAdjoining
- 76 Horder Road London Borough of Hammersmith and Fulham SW6 5EEWithdrawn45 yd
- 56 Colehill Lane London Borough of Hammersmith and Fulham SW6 5EGPending49 yd
- 40 Horder Road London Borough of Hammersmith and Fulham SW6 5EEPermitted50 yd