London Borough of Hammersmith and Fulham
Recladding of existing fascia board including display of 1no internally halo illuminated fascia sign to replace the existing sign to the northern elevation; recladding of existing totem including display of 1no internally halo illuminated sign and menu board to replace the existing; erection of non-illuminated hoarding for a temporary period during building works.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2022/00511/ADV
- Local authority
- Hammersmith and Fulham
- Ward
- SBG
- Application type
- All Other
Key dates
- Submitted
- 25 Mar 2022
- Validated
- 25 Mar 2022
- Comments close
- 29 Apr 2022
- Target decision
- 20 May 2022
- Decided
- 23 May 2022
Estimated project value
£1k–£8k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- 19 Shepherd's Bush Place London Borough of Hammersmith and Fulham W12 8LXUnknownAdjoining
- London Borough of Hammersmith and FulhamUnknownAdjoining
- 19 Shepherd's Bush Place London Borough of Hammersmith and Fulham W12 8LXPermittedAdjoining
- 19 Shepherd's Bush Place London Borough of Hammersmith and Fulham W12 8LXPermittedAdjoining
- London Borough of Hammersmith and FulhamPermittedAdjoining