London Borough of Hammersmith and Fulham
Works to bridge to allow for stabilisation works north east and north west bridge pedestals; permanent interventions to include the addition of steel brackets to existing deviation saddles, replacement of steel rollers with elastomeric bearings, and infilling of internal voids with reinforced concrete; temporary interventions to include dismantling of cast iron pedestal casing panels, and dismantling of sections of pedestrian balustrade/parapet panels; and erection of temporary timber hoarding around the pedestals.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2021/03680/LBCHF
- Local authority
- Hammersmith and Fulham
- Ward
- HBROAD
- Application type
- All Other
Key dates
- Submitted
- 13 Dec 2021
- Validated
- 13 Dec 2021
- Comments close
- 7 Jan 2022
- Target decision
- 7 Feb 2022
- Decided
- 25 Feb 2022
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door