London Borough of Hammersmith and Fulham
Details to partially discharge condition 17 (detailed internal drawings); condition 18 (Internal materials) and condition 20 (Detailed fenestration drawings) for Phase 1 (works within the Main Building to form the well-being suite and works to the first floor west wing offices only) of planning permission (ref. 2020/01524/FUL) dated 13 May 2021.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2021/01486/DET
- Local authority
- Hammersmith and Fulham
- Ward
- AVONMO
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 14 May 2021
- Validated
- 14 May 2021
- Comments close
- 4 Jun 2021
- Target decision
- 9 Jul 2021
- Decided
- 2 Jul 2021
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door