London Borough of Hammersmith and Fulham
Replacement of existing pedestrian and vehicle access gates with new pedestrian and vehicle entrance gates in the same location; installation of 1no new key pads and intercom to the pedestrian gate, and 2no new key pads and intercom to vehicle access gate.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2020/02839/LBC
- Local authority
- Hammersmith and Fulham
- Ward
- TOWN
- Application type
- All Other
Key dates
- Submitted
- 3 Nov 2020
- Validated
- 3 Nov 2020
- Comments close
- 26 Nov 2020
- Target decision
- 29 Dec 2020
- Decided
- 24 Dec 2020
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 685 Fulham Road London Borough of Hammersmith and Fulham SW6 5UJPermittedNext door
- 685 Fulham Road London Borough of Hammersmith and FulhamPermittedNext door
- 685 Fulham Road London Borough of Hammersmith and FulhamPermittedNext door
- 687 Fulham Road London Borough of Hammersmith and Fulham SW6 5UJPermittedNext door
- 4 Shottendane Road London Borough of Hammersmith and Fulham SW6 5TJPermittedAdjoining
- 685 Fulham Road London Borough of Hammersmith and Fulham SW6 5UJPermittedAdjoining