← Back to search

Permitted2020/01583/FULSubmitted 6 years agoLoft conversion

London Borough of Hammersmith and Fulham

Erection of a front roof extension and replacement of the existing rear roof extension involving an increase in the ridge height by 300mm, erection of a rear extension at second floor level over part of the existing back addition and the replacement of existing window with a new window to the side of rear back addition at first floor level to no. 80 Gowan Avenue; erection of single storey rear extensions, to the side of the existing back additions and installation of bi-folding doors to the ground floor rear elevation to both properties at no. 80 and 82 Gowan Avenue (amended description).

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
29 Jun 2020
— completed
Validated
29 Jun 2020
— completed
Consultation
8 Sept 2020
— completed
Target date
24 Aug 2020
— completed
Decided
9 Sept 2020
— completed

Application details

Reference
2020/01583/FUL
Local authority
Hammersmith and Fulham
Ward
MUNSTE
Application type
All Other
Property type
House

Key dates

Submitted
29 Jun 2020
Validated
29 Jun 2020
Comments close
8 Sept 2020
Target decision
24 Aug 2020
Decided
9 Sept 2020

Estimated project value

£28k–£75k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade 2026 loft conversion cost guide.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications