← Back to search

Withdrawn2019/03760/LBCSubmitted 6 years agoWindows and doors

London Borough of Hammersmith and Fulham

Installation of new double doors to replace an existing window at ground floor level to the eastern elevation of the existing Design and Technology Department block (Russell building), opening onto an enclosed courtyard area within the grounds of the school; internal alterations to the Design and Technology block by the creation of an additional area for workshops formed by the rearrangement of its interior only; reinstatement of a window at first floor level to the rear elevation of Bute Hall; and internal alterations and rearrangement to Bute Hall, which is currently vacant, to provide additional sixth form facilities and teaching space.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
5 Feb 2020
— completed
Validated
5 Feb 2020
— completed
Consultation
23 Jan 2020
— completed
Target date
1 Apr 2020
— completed
Decided
7 May 2020
— completed

Application details

Reference
2019/03760/LBC
Local authority
Hammersmith and Fulham
Ward
HBROAD
Application type
All Other

Key dates

Submitted
5 Feb 2020
Validated
5 Feb 2020
Comments close
23 Jan 2020
Target decision
1 Apr 2020
Decided
7 May 2020

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications