London Borough of Hammersmith and Fulham
Temporary access into the Imperial North Campus: to enable existing services to be diverted and incoming services to be installed, with temporary security cabin and access control point, hoarding and gates, as part of an enabling works package for the development of plots A & G.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/03704/FUL
- Local authority
- Hammersmith and Fulham
- Ward
- COLLP
- Application type
- All Other
Key dates
- Submitted
- 13 Dec 2019
- Validated
- 13 Dec 2019
- Comments close
- 30 Jan 2020
- Target decision
- 7 Feb 2020
- Decided
- 5 Mar 2020
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- BLOCK B WOODLANDS, 80 WOOD LANE Hammersmith and Fulham W12PermittedNext door
- London Borough of Hammersmith and FulhamPermittedAdjoining
- London Borough of Hammersmith and FulhamPermittedAdjoining
- London Borough of Hammersmith and FulhamPermittedAdjoining
- London Borough of Hammersmith and FulhamPermittedAdjoining
- London Borough of Hammersmith and FulhamPermittedAdjoining