London Borough of Hammersmith and Fulham
Details to discharge Condition 24 (Piling Method Statement); Condition 30 (Surface Water Drainage); Condition 34 (Energy Strategy); Condition 37 (Sustainability Statement); Condition 66 (Vehicular Parking); Condition 84 (Aerials and Satellite Dishes); Condition 88 (Secure by Design - Basement Phases); Condition 95 (Protection of Existing Trees); and Condition 101 (Existing and Proposed Levels) for Phase 2a (Plot B1) of planning permission 2018/02100/COMB dated 8 February 2019.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/01609/DET
- Local authority
- Hammersmith and Fulham
- Ward
- PGW
- Application type
- All Other
Key dates
- Submitted
- 27 May 2019
- Validated
- 27 May 2019
- Comments close
- 24 Jun 2019
- Target decision
- 22 Jul 2019
- Decided
- 20 Aug 2019
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door