London Borough of Hammersmith and Fulham
Discharge of Condition 16 (materials), Condition 23 (lifetime homes), Condition 24 (children's play space), Condition 27 (micro climate mitigation), Condition 30 (green and brown roofs), Condition 31 (energy strategy), Condition 36 (sound insulation), Condition 37 (lighting management plan), Condition 42 (accessibility strategy), Condition 49 ( landscape and ecology management plan), Condition 63 (privacy screens) and Condition 64 (typical bays) for Phase 4 and Phase 5 of planning permission 2011/01472/COMB dated 27th March 2012 and subsequent variation permission 2016/00765/VAR dated 31 March 2017.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/00360/DET
- Local authority
- Hammersmith and Fulham
- Ward
- SANDSE
- Application type
- All Other
Key dates
- Submitted
- 6 Feb 2019
- Validated
- 6 Feb 2019
- Target decision
- 3 Apr 2019
- Decided
- 14 May 2019
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamWithdrawnNext door