London Borough of Hammersmith and Fulham
Change of use of the existing building from a youth centre (D1) into an office (Class B1); formation of a bin store and use of existing summerhouse for cycle parking; internal alterations to include: Complete refurbishment and restoration, including re-instating missing doors, repairing damaged joinery and windows, replacing missing skirts and other joinery, carrying out repairs as specified to ensure the building is weather-tight, restoration of the stone floors, re-instating missing chimneypieces, and re-landscaping.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 2019/00005/LBC
- Local authority
- Hammersmith and Fulham
- Ward
- SANDSE
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 7 Feb 2019
- Validated
- 7 Feb 2019
- Comments close
- 8 Mar 2019
- Target decision
- 4 Apr 2019
- Decided
- 31 Jul 2023
Estimated project value
£12k–£40k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of Hammersmith and FulhamUnknownNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door
- London Borough of Hammersmith and FulhamPermittedNext door