Land At Daresbury Park Warrington WA4 4BB
Application to discharge condition no.s 9 (CEMP), 12 (Levels), 15 (Updated Noise Assessment), 17 (Drainage Strategy), 18 (Foul Water Drainage Scheme), 19 (Samples of Materials), 20 (Hard and Soft Landscaping), 22 (Electric Vehicle Charging Point Details), 23 (Waste and Recycling Strategy) and 24 (LEMP) of planning permission 20/00337/OUTEIA at
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/00414/COND
- Local authority
- Halton
- Property type
- Land
Key dates
- Submitted
- 23 Oct 2026
- Validated
- 23 Oct 2026
- Target decision
- 18 Dec 2026
Estimated project value
£800–£2k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.