Queen Elizabeth Olympic Park Hackney E20
Submission of details to discharge Conditions LCS0.88 (Surface Water Drainage) LCS0.36 (Zonal Development Frontage Scheme), LCS0.67 (Perimeter Security Fencing), LCS0.68 (Perimeter Construction Fencing) and LCS0.69 (Temporary Highways Access) of the Legacy Communities Scheme Outline Planning Permission (11/90621/OUTODA, as varied by 14/00036/VAR, 17/00036/VAR and 18/00471/VAR) and for approval of details by reserved OD.0.23 (Surface Water Drainage) of Parkland Planning Permission (07/90010/OUMODA) in so far as it relates to East Wick Phase 3.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/00368/AOD
- Local authority
- Hackney
- Postcode
- E20
- Ward
- Hackney Wick Ward
- Application type
- All Other
Key dates
- Submitted
- 13 Sept 2024
- Validated
- 13 Sept 2024
- Target decision
- 8 Nov 2024
- Decided
- 30 Oct 2024
Estimated project value
£3k–£14k
Typical UK cost for this job type, at inner London rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- EASTWAY Hackney E20 3BSPermittedNext door
- Queen Elizabeth Olympic Park Hackney E20PermittedNext door
- Planning Delivery Zone 5 Hackney E20PermittedNext door
- HackneyPermittedNext door
- Queen Elizabeth Olympic Park HackneyPermittedNext door
- Queen Elizabeth Olympic Park HackneyWithdrawnNext door