Refused2019/0973Submitted 7 years agoWindows and doors

154 DALSTON LANE Hackney

Non material amendment to planning permission 2014/0610 dated 20/01/2015 to allow retention of existing electrical substation in the front and centre of the proposed building at ground floor level; to increase the size of the core; to decrease residential and commercial floorspace; to increase the massing at 4th floor level; to alter the window arrangement on the side elevation; to increase the building's depth at 1st to 4th floor level; to remove a set in at the side elevation.

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
1 May 2019
— completed
Validated
1 May 2019
— completed
Consultation
— completed
Target date
29 May 2019
— completed
Decided
20 May 2019
— completed

Application details

Reference
2019/0973
Local authority
Hackney
Ward
Hackney Central Ward
Application type
All Other
Property type
Commercial

Key dates

Submitted
1 May 2019
Validated
1 May 2019
Target decision
29 May 2019
Decided
20 May 2019

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications