← Back to search

Permitted12/00262/LBCSubmitted 13 years agoBoundary treatment

Carpenters Road Hackney

Construction of a permanent replacement Gainsborough School pedestrian bridge (Bridge F13) across the River Lee Navigation between Gainsborough School and the Olympic Park including associated ramps and stairs, hard and soft landscaping (including retention of and new landscaping to the existing amenity area on the west side of the Lee Navigation), lighting and details which demonstrate how public access could be achieved in the future; Taking down of the existing eastern brick boundary wall to the School playground and reuse where possible of the bricks to clad the bridge approach stairs and ramp; upper ramp section formed of open steel columns; new weld mesh fence 3m high above the ramp surface along 60m length of the school boundary.

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
3 Jan 2013
— completed
Validated
3 Jan 2013
— completed
Consultation
21 Oct 2024
— completed
Target date
28 Feb 2013
— completed
Decided
27 Mar 2013
— completed

Application details

Reference
12/00262/LBC
Local authority
Hackney
Ward
Hackney Wick Ward
Application type
All Other

Key dates

Submitted
3 Jan 2013
Validated
3 Jan 2013
Comments close
21 Oct 2024
Target decision
28 Feb 2013
Decided
27 Mar 2013

Estimated project value

£2k–£10k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.