Carpenters Road Hackney
Construction of a permanent replacement Gainsborough School pedestrian bridge (Bridge F13) across the River Lee Navigation between Gainsborough School and the Olympic Park including associated ramps and stairs, hard and soft landscaping (including retention of and new landscaping to the existing amenity area on the west side of the Lee Navigation), lighting and details which demonstrate how public access could be achieved in the future; Taking down of the existing eastern brick boundary wall to the School playground and reuse where possible of the bricks to clad the bridge approach stairs and ramp; upper ramp section formed of open steel columns; new weld mesh fence 3m high above the ramp surface along 60m length of the school boundary.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 12/00262/LBC
- Local authority
- Hackney
- Ward
- Hackney Wick Ward
- Application type
- All Other
Key dates
- Submitted
- 3 Jan 2013
- Validated
- 3 Jan 2013
- Comments close
- 21 Oct 2024
- Target decision
- 28 Feb 2013
- Decided
- 27 Mar 2013
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Queen Elizabeth Olympic Park Hackney E20WithdrawnNext door
- Hackney E9 5NDPermittedNext door
- 1 East Bay Lane Hackney E15 2GWPermitted54 yd
- 1 East Bay Lane Hackney E15 2GWPermitted54 yd
- Leabank Square Hackney E9 5LPRefused78 yd
- 41 Leabank Square Hackney E9 5LPPermitted83 yd