Greenwich
Certificate of Lawfulness (Proposed) is sought for the removal of sections of the existing render system and zinc cladding, and the removal of the existing facing brickwork and steel mesh to Blocks A and B. Removal of sections of the existing zinc cladding to Block C1. Removal and replacement of the existing render system, IBSTOCK tiles, coloured cladding, spandrel panels and zinc cladding, and the removal of the existing facial brickwork to Block C2. All to achieve a minimum fire classification of A2-s1,d0 in accordance with BS EN 13501-1.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/3072/CP
- Local authority
- Greenwich
- Ward
- GREENWICH CREEKSIDE
- Application type
- All Other
Key dates
- Submitted
- 26 Oct 2026
- Validated
- 26 Oct 2026
Estimated project value
£6k–£20k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- 30 Norman Road Greenwich SE10 9QXPermitted55 yd
- LewishamPermitted62 yd
- Hilton's Wharf (BPTW), 30 -52 Norman Road Greenwich SE10 9QXPermitted63 yd
- GreenwichPending69 yd
- GreenwichPending71 yd
- GreenwichPending71 yd