← Back to search

Pending26/3072/CPSubmitted 3 weeks agoRender and cladding

Greenwich

Certificate of Lawfulness (Proposed) is sought for the removal of sections of the existing render system and zinc cladding, and the removal of the existing facing brickwork and steel mesh to Blocks A and B. Removal of sections of the existing zinc cladding to Block C1. Removal and replacement of the existing render system, IBSTOCK tiles, coloured cladding, spandrel panels and zinc cladding, and the removal of the existing facial brickwork to Block C2. All to achieve a minimum fire classification of A2-s1,d0 in accordance with BS EN 13501-1.

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
26 Oct 2026
— completed
Validated
26 Oct 2026
— completed
Consultation
—
— not yet reached
Target date
—
— not yet reached
Decided
—
— not yet reached

Application details

Reference
26/3072/CP
Local authority
Greenwich
Ward
GREENWICH CREEKSIDE
Application type
All Other

Key dates

Submitted
26 Oct 2026
Validated
26 Oct 2026

Estimated project value

£6k–£20k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications