Greenwich
Removal of deteriorated existing asphalt flat roof and replacement with a new timber frame mono-pitch roof with clay tile finish to match existing local character. UPVC top opening rear bathroom window to be removed and replaced with a new metal frame top hung casement window with obscure glazed finish to prevent overlooking. New metal frame roof light with obscured glazed finish to prevent overlooking. Existing UPVC rainwater pipework drainage removed and replaced with new pipework to match existing. Internal timber stud wall reconfiguration to gain more useable space in bathroom. External fa‡ade to be infilled with new blockwork and refinished to match existing render finish.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 24/1925/HD
- Local authority
- Greenwich
- Ward
- PLUMSTEAD & GLYNDON
- Application type
- Householder
- Property type
- Flat
Key dates
- Submitted
- 14 Jun 2024
- Validated
- 14 Jun 2024
- Comments close
- 24 Jul 2024
- Decided
- 31 Jul 2024
Estimated project value
£7k–£19k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: Checkatrade / BestBuilders 2026 roof replacement, 3-bed semi.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.