Greenwich
Alterations of Two Timber Boardwalks at the Greenwich Peninsula Ecology Park - extend an existing spur off the inner boardwalk to form a bridge across to the outer boardwalk spanning a distance of approximately 10-12metres. This will be constructed using timber materials to match the existing boardwalks; and (b) to remove the gates and sections of the boardwalk at either end of the outer boardwalk so that access to the park will only be via the gatehouse. The Northern gate onto the boardwalk at the gatehouse will be replaced with post and rails to match the existing fence and the gate in the southern boundary, which will be closed by planting a hedgerow to match the existing hedgerow.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 23/2663/F
- Local authority
- Greenwich
- Ward
- GREENWICH PENINSULA
- Application type
- All Other
Key dates
- Submitted
- 22 Sept 2023
- Validated
- 22 Sept 2023
- Comments close
- 8 Nov 2023
- Target decision
- 30 Nov 2023
- Decided
- 29 Nov 2023
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- GMV (Phase 1a) Faraday & Alamero Lodges Mudlarks Boulevard Bugsby Way & West Parkside Greenwich SE10Permitted55 yd
- GreenwichPermitted87 yd
- GMV (Phase 1b - Watermark) Maurer Court Mudlarks Boulevard West Parkside Greenwich SE10Permitted94 yd
- GreenwichPermitted103 yd
- GreenwichPermitted114 yd
- GreenwichWithdrawn118 yd