Greenwich
One self-illuminated fascia sign above the main entrance attached to the existing wiring bar fixed to the existing glazing and proposed aluminium snap frames to be fixed to the existing posts of seating barriers with printed vinyl graphics.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 23/0787/A
- Local authority
- Greenwich
- Ward
- GREENWICH PENINSULA
- Application type
- All Other
Key dates
- Submitted
- 6 Mar 2023
- Validated
- 6 Mar 2023
- Comments close
- 12 Apr 2023
- Decided
- 3 May 2023
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.