Greenwich
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non material amendment in connection with the planning permission 16/2309/F, dated 31/07/2017 for the Erection of Estate Services Buildings for B1 and B8 use, vehicle access, car parking, cycle parking, boundary treatment and associated ancillary works to allow the removal of Conditions 8 (Carbon Emissions Reduction) and alterations to the wording of conditions 9 (Future Connection to Heating, Cooling and Power Networks), 10 (On-Site Renewable Energy Technologies) & 11 (On-Site Renewable Energy Technologies - Evidence of Installation).
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 20/1650/NM
- Local authority
- Greenwich
- Ward
- PENINSULA - NO LONGER EXISTS
- Application type
- All Other
Key dates
- Submitted
- 10 Jun 2020
- Validated
- 10 Jun 2020
- Target decision
- 13 Jan 2023
- Decided
- 9 Jan 2023
Estimated project value
£15k–£120k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.