Marshall Lands Farm House Broom Lane Newcastle Upon Tyne NE16 4RA
Proposed changes to the house include the introduction of a single storey side/rear extension with a mono pitched roof (living room), a single storey side extension with an intersecting gable roof (dining room), altering and adding new doors and windows to three sides of the house, removal of the chimney stack and pots on the north end of house and installation of zinc cladding to the rear. Also, convert the detached garage building into a home office by swapping a window on the south face for a new access door, replacing the roller shutter door on the east gable for a glazed wall and inserting 6 new rooflights on to the roof.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- DC/26/00596/HHA
- Local authority
- Gateshead
- Property type
- Commercial
Key dates
- Submitted
- 22 Jul 2026
- Validated
- 28 Jul 2026
- Comments close
- 19 Aug 2026
- Target decision
- 22 Sept 2026
Estimated project value
£30k–£55k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote / Checkatrade 2026, ~20m² at £1,800-£3,000/m².
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.