← Back to search

PendingF/YR26/3116/CONDSubmitted 4 weeks agoNew dwelling

Phase B Land East Of Berryfield March Cambridgeshire

Details reserved by Condition 02 (suface water construction), 03 (archaeology), 04 (construction method statement), 05 (swept path analysis), 06 (levels), 08 (surface water drainage), 09 (drainage and maintenance), 12 (materials) and 14 (refuse collection) of planning permission F/YR25/0586/F (Erect 15 x dwellings with associated infrastructure and the formation of 1 x balancing pond and public open space)

Find on council portalDocuments (25)Comment

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
10 Aug 2026
— completed
Validated
19 Aug 2026
— completed
Consultation
— not yet reached
Target date
14 Oct 2026 (target)
— not yet reached
Decided
— not yet reached

Application details

Reference
F/YR26/3116/COND
Local authority
Fenland
Ward
March North
Application type
Conditions

Key dates

Submitted
10 Aug 2026
Validated
19 Aug 2026
Target decision
14 Oct 2026

25 documents · 0 comments · 0 constraints

Estimated project value

£500k–£1050k

Typical UK cost for this job type, scaled for a medium scheme, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyBuilder / RapidQS 2026, ~120m² at £2,000-£3,500/m².

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.

Nearby applications