Phase B Land East Of Berryfield March Cambridgeshire
Details reserved by Condition 02 (suface water construction), 03 (archaeology), 04 (construction method statement), 05 (swept path analysis), 06 (levels), 08 (surface water drainage), 09 (drainage and maintenance), 12 (materials) and 14 (refuse collection) of planning permission F/YR25/0586/F (Erect 15 x dwellings with associated infrastructure and the formation of 1 x balancing pond and public open space)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- F/YR26/3116/COND
- Local authority
- Fenland
- Ward
- March North
- Application type
- Conditions
Key dates
- Submitted
- 10 Aug 2026
- Validated
- 19 Aug 2026
- Target decision
- 14 Oct 2026
25 documents · 0 comments · 0 constraints
Estimated project value
£500k–£1050k
Typical UK cost for this job type, scaled for a medium scheme, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyBuilder / RapidQS 2026, ~120m² at £2,000-£3,500/m².
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Land West Of 132 Elm Road Access Via Marwick Road March CambridgeshirePermitted0.3 miles
- Estover Playing Field Estover Road March CambridgeshirePending0.3 miles