Land North West Of Middle Level Commissioners Whittlesey Road March Cambridgeshire
Variation of conditions 3 (surface water drainage) and 10 (list of approved drawings) relating to planning permission F/YR21/0887/F (Erect 1 x office/workshop, 1 x vehicle workshop and 1 x training centre, 2.4m high (approx) fence and formation of car park and associated infrastructure) to enable submission of a detailed surface water drainage strategy (including levels); revised layout and hardstanding to reflect this, revised training room design and inclusion of a substation
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- F/YR25/0466/VOC
- Local authority
- Fenland
- Ward
- March West And Benwick
- Application type
- Conditions
- Property type
- Commercial
Key dates
- Submitted
- 12 Jun 2025
- Validated
- 16 Jun 2025
- Comments close
- 1 Apr 2026
- Target decision
- 15 Sept 2025
- Decided
- 24 Aug 2026
72 documents · 0 comments · 0 constraints
Estimated project value
£20k–£75k
Typical UK cost for this job type, scaled for a medium scheme, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.