The Lodge Bourne Hall Spring Street Ewell Surrey KT17 1UD
Restoration, repair, and upgrading of the lodge and entrance features. The proposal involves no material structural alterations, extensions, or adaptations. Detailed Scope of Works: Entrance & Gates: Specialist masonry repair to the griffin gate finial, render remediation, and refurbishment/redecoration of the cast iron gates and lighting. Lodge External: Chimney and masonry repairs, replacement period-appropriate windows, doors, fascia, and portico bargeboards, with new rainwater goods and ground gullies to prevent flooding and damp. Lodge Internal: Replacement of failed ceilings and plaster with insulated finishes, ground floor insulation, new floor coverings, a replacement staircase/handrail, and targeted joinery replacement. Services & Fit-out: Installation of a period-style kitchen and bathroom, full redecoration, and procurement of period hearths for decommissioned wood-burning stoves.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/00879/FUL
- Local authority
- Epsom and Ewell
Key dates
- Submitted
- 16 Sept 2026
- Validated
- 16 Sept 2026
- Comments close
- 7 Oct 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.