Centre Way Enfield Council
Non-material amendment to 24/03805/FUL to allow the use of Elite 51 and 55 horizontal trapezoidal insulation instead of Elite 50 and 60 horizontal half-round profiled cladding, insert areas of PPC aluminium windows into the polycarbonate translucent panels to provide views out from the offices, add windows to the Unit 1 staircase (elevation 4, south), and remove a translucent panel segment from Unit 7 south elevation, replacing it with Elite 51 trapezoidal vertical profiled sheeting to improve fire safety.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/03318/NMA
- Local authority
- Enfield
- Ward
- Lower Edmonton
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 4 Aug 2026
- Validated
- 4 Aug 2026
- Comments close
- 2 Sept 2026
- Target decision
- 1 Sept 2026
- Decided
- 27 Aug 2026
Estimated project value
£4k–£12k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Recorded changes
- 5 Sept 2026: Approved
Nearby applications
- Centre Way Enfield CouncilPermittedNext door
- Centre Way Enfield CouncilPendingNext door
- Centre Way Enfield CouncilPermittedNext door
- Centre Way Enfield CouncilRefusedNext door
- Centre Way Enfield CouncilPermittedNext door
- Centre Way Enfield CouncilPendingNext door