Non material amendment to 18/03009/FUL to allow increase in upstand height (to1200mm AFFL) on southern elevation, increase in fence height along northern (partly), southern and eastern boundaries to 2.4m, increase in generator housing size and change to render in lieu of recon stone cladding, reduction in sub-station housing size, change to include Green GRP enclosure, allocation of future Electrical Vehicle charging bays, orientation of accessible parking spaces, access doors into ground floor plant room in east elevation, basement cycle parking, addition of lift lobby in basement, additional ductwork to southern elevation outside of plant screen, addition of smoke extract ductwork above ramp to basement, together with changes to hard-landscaping to 'Pocket Park' and roof top plant equipment.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 20/03623/NMA
- Local authority
- Enfield
- Ward
- GA
- Application type
- All Other
Key dates
- Submitted
- 9 Nov 2020
- Validated
- 9 Nov 2020
- Target decision
- 7 Dec 2020
- Decided
- 11 Mar 2021
Estimated project value
£100k–£250k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- Enfield CouncilPermittedNext door
- Enfield CouncilWithdrawnNext door
- EnfieldPermittedNext door
- Enfield CouncilPermittedNext door
- EnfieldPermittedNext door
- Enfield CouncilPermittedNext door