Water Treatment Works East Back Side Haisthorpe East Riding Of Yorkshire
Removal of Condition 7 (reinstatement of junction) and Variation of Condition 10 and 13 of planning permission 25/02878/PLF (Construction of an extension to Haisthorpe Water Treatment Works for installation of a Nitrate Removal Plant including the erection of an IEX Building, a Brine tank with bund wall, two Salt Saturators with bund wall, 3 metre high security fencing and associated equipment, landscaping and highway alterations) to reference a revised Construction Traffic Management Plan (CTMP)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 26/02675/VAR
- Local authority
- East Riding
- Ward
- East Wolds And Coastal
- Application type
- Conditions
Key dates
- Submitted
- 5 Oct 2026
- Validated
- 19 Oct 2026
- Target decision
- 14 Dec 2026
12 documents · 2 comments · 0 constraints
Estimated project value
£2k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.