Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire
To discharge Conditions 3 (Surface Water Management) and Condition 10 (surface water drainage) of decision 23/00377/ESF dated 15 December 2023 for construction of glasshouses with integrated packing and distribution unit, combined heat and power (CHP) plant, heat storage tanks, an irrigation centre, employee welfare / canteen, access roads, parking, surface water attenuation lagoon, landscaping and other ancillary development
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 23/00377/DISF
- Local authority
- East Cambridgeshire
- Ward
- Stretham
- Application type
- Conditions
- Property type
- Agricultural
Key dates
- Submitted
- 20 May 2026
- Validated
- 20 May 2026
- Target decision
- 15 Jul 2026
- Decided
- 12 Aug 2026
18 documents · 2 comments · 10 constraints
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.