Land Off Central Promenade Sutton On Sea Lincolnshire
Section 73 application to vary condition no. 2 (approved plans), no. 5 (flood risk assessment), no. 7 (flood evacuation plan) and no. 10 (commercial turning space) as previously imposed on planning permission reference N/110/00176/21 for the Erection of a building incorporating a caf�, restaurant, multipurpose space and associated ancillary spaces including accessible wc's and changing places facilities. Erection of �15no. beach huts, and 6no. overnight lodges with associated landscaping.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 01221/26/RVC
- Local authority
- East Lindsey
- Property type
- Commercial
Key dates
- Submitted
- 27 Jul 2026
- Validated
- 29 Jul 2026
- Comments close
- 28 Aug 2026
- Target decision
- 28 Oct 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.