London Borough of Ealing
Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 263110NMAR3
- Local authority
- Ealing
- Ward
- PITSHG
- Application type
- All Other
Key dates
- Submitted
- 14 Aug 2026
- Validated
- 14 Aug 2026
- Comments close
- 8 Sept 2026
- Target decision
- 10 Sept 2026
Estimated project value
£200k–£420k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyBuilder / RapidQS 2026, ~120m² at £2,000-£3,500/m².
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.