London Borough of Ealing
Approval of Reserved Matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to Condition 2 and details pursuant to the partial discharge of Conditions 47 (i) (Contaminated Land), 53 (i) (Public Art) and full discharge of Conditions 48 (Written Scheme of Investigation), 50 (Water Infrastructure Details), 59 (Biodiversity Net Gain), 64 (Generator and Fuel Technology), 65 (Selective Catalytic Reduction), 66 (Generator Operating Regime), 67 (Emission Reduction and Management Plan), 68 (Emissions Monitoring Plan), and 76 (Generator Emission Evidence) of Planning Permission ref. 78343/APP/2025/719, dated 20/05/2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data entre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (Out of Borough)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 263006CONS
- Local authority
- Ealing
- Ward
- OOB
- Application type
- All Other
- Property type
- House
Key dates
- Submitted
- 27 Jul 2026
- Validated
- 27 Jul 2026
- Target decision
- 17 Aug 2026
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.