London Borough of Ealing
Details of condition 9 (Fibre Connectivity Plans) for Block A pursuant to planning permission reference 23/0014/FUMOPDC dated 26/03/2025 for Demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement ( out of borough)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 262924OPDCOB
- Local authority
- Ealing
- Ward
- OOB
- Application type
- All Other
- Property type
- Commercial
Key dates
- Submitted
- 28 Jul 2026
- Validated
- 28 Jul 2026
- Target decision
- 17 Aug 2026
- Decided
- 17 Aug 2026
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Recorded changes
- 5 Sept 2026: Status now unknown