Permitted261867CPLSubmitted 4 months agoWindows and doors

London Borough of Ealing

Reinstatement and correction of cavity barriers within the brick-clad façade; Installation of missing vertical cavity barriers and review of existing horizontal cavity barriers within the rainscreen cladding system; Verification and replacement, if required, of the window adjacent to Plot 10 to ensure appropriate fire resistance; Temporary removal and reinstatement of existing aluminium cladding panels and limited areas of brickwork solely to facilitate access for the above works  (Lawful Development Certificate for a Proposed Development)

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Progress

Submitted
6 May 2026
— completed
Validated
6 May 2026
— completed
Consultation
— completed
Target date
1 Jul 2026
— completed
Decided
1 Jul 2026
— completed

Application details

Reference
261867CPL
Local authority
Ealing
Ward
EASACT
Application type
All Other

Key dates

Submitted
6 May 2026
Validated
6 May 2026
Target decision
1 Jul 2026
Decided
1 Jul 2026

Estimated project value

£4k–£12k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB 2026 double glazing guide, 3-bed semi full replacement.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.