Permitted260952NMASubmitted 6 months agoBasement

London Borough of Ealing

Application for a Non-Material Amendment in (S96a) seeking to allow a substituted Predominant Ground Floor Uses Plan as consented under planning permission ref PP/2015/4682 dated 18.02.16 (as amended 171562VAR dated 16.10.2017) for: section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical......

Find on council portal

Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.

Map of the site

Progress

Submitted
5 Mar 2026
— completed
Validated
5 Mar 2026
— completed
Consultation
— completed
Target date
1 Apr 2026
— completed
Decided
30 Apr 2026
— completed

Application details

Reference
260952NMA
Local authority
Ealing
Ward
SOUWST
Application type
All Other
Property type
Commercial

Key dates

Submitted
5 Mar 2026
Validated
5 Mar 2026
Target decision
1 Apr 2026
Decided
30 Apr 2026

Estimated project value

£100k–£250k

Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.

Planning constraints

No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.

Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.