London Borough of Ealing
Details of a demolition method statement and construction management plan pursuant to condition 5 of planning permission ref: 244597HH dated 14/02/2025 for: Excavation to provide basement level beneath the existing house and garden with lightwell; two storey rear extension; creation of a rear roof terrace at second floor level of existing flat roof; roof alteration involving raising of the ridge height, installation of one conservation style roof light to front roof slope, three conservation roof lights to side (western) roof slope and installation of four conservation style rooflight to side (eastern) roof slope; installation of frosted glass bricks to side (eastern) elevation; replacement of existing windows; and boundary treatment
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 250839CND
- Local authority
- Ealing
- Ward
- EALCOM
- Application type
- All Other
- Property type
- Flat
Key dates
- Submitted
- 4 Mar 2025
- Validated
- 4 Mar 2025
- Comments close
- 24 Mar 2025
- Target decision
- 29 Apr 2025
- Decided
- 24 Mar 2025
Estimated project value
£55k–£130k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: FMB / Checkatrade 2026, £2,000-£2,800/m² over a larger floor area.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of EalingPermittedNext door
- London Borough of EalingPermittedNext door
- London Borough of EalingPermittedNext door
- Uxbridge Road Ealing W3 9SLPermittedNext door
- Uxbridge Road Ealing W3 9SLPermittedNext door
- Uxbridge Road Ealing W3 9SLPermittedNext door