London Borough of Ealing
Application for the partial discharge of requirement ACTST5 (Landscaping Works - hard surfacing / parking and circulation areas) of Schedule 3 of The Thames Water Utilities Limited (Thames Tideway Tunnel) Order (SI:2014/2384) as amended by The Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) Order (SI:2015/723) and the Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2017 (SI:2017/659), and the Notice of Variation No. 1 (17 March 2015) and Notice of Variation No.2 (17 August 2017) in respect of the Deemed Marine Licence.
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 244598CND
- Local authority
- Ealing
- Ward
- SOUFLD
- Application type
- All Other
Key dates
- Submitted
- 3 Dec 2024
- Validated
- 3 Dec 2024
- Comments close
- 26 Dec 2024
- Target decision
- 28 Jan 2025
- Decided
- 18 Feb 2025
Estimated project value
£3k–£25k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: trade estimate.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.
Nearby applications
- London Borough of EalingPermittedNext door
- Warple Way Ealing W3 0RGPermittedNext door
- Warple Way Ealing W3 0RGPermittedNext door
- Warple Way Ealing W3 0RGPermittedNext door
- Warple Way Ealing W3 0RGPermittedNext door
- Warple Way Ealing W3 0RGPermittedNext door