Frogmore Industrial Estate Acton Lane Park Royal NW10 7NQ
Demolition of existing boundary walls and retaining walls, removal of existing hardstanding, removal of redundant drainage infrastructure, diversion of below ground services, soil remediation works, earthworks to regrade site levels, installation of piling mat and construction of piles, installation of hoardings, and installation of demountable site management buildings. (Out of Borough Re-consultation)
Tracking, tags and letters are part of the paid plan. See what it costs. Searching and reading any record stays free.
Progress
Application details
- Reference
- 263920OPDCOB
- Local authority
- Ealing
- Property type
- House
Key dates
- Submitted
- 26 Oct 2026
- Validated
- 26 Oct 2026
- Target decision
- 15 Nov 2026
Estimated project value
£3k–£10k
Typical UK cost for this job type, at UK average rates (2026). Estimated from the proposal description — planning applications do not state build cost. Source: MyJobQuote 2026, £40-£120/m² installed.
Planning constraints
No designations recorded at this location. This is not a formal search — always confirm with the local authority before relying on it.
Designations from planning.data.gov.uk, Open Government Licence v3.0. Indicative only — not a formal local authority search.